This document references:
S1157 - Track – Performance, Design and Configuration
Published by LUL
on
March 1, 2023
This standard applies to all London Underground (LU) track including running lines depot track and sidings. The standard covers: a) principles for new designs of track components and configurations...
This document references:
1-173 - Plant, Tools and Equipment - Inspection and Maintenance
Published by LUL
on
October 1, 2007
This standard sets out the inspection and maintenance requirements to be met for all plant, tools and equipment proposed for use on, or which may affect, the LU infrastructure. This includes all...
This document references:
S1157 - Track – Performance, Design and Configuration
Published by LUL
on
March 1, 2023
This standard applies to all London Underground (LU) track including running lines depot track and sidings. The standard covers: a) principles for new designs of track components and configurations...
This document references:
S1622 - Glossary of Terms and Abbreviations
Published by LUL
on
July 1, 2016
This Standard applies to all Category 1, 2 and 5 Standards and the Railway Safety Case (and successor documents). It applies to technical and financial documents where applicable and communications...
This document is referenced by:
S1158 - Track – Inspection and Maintenance
Published by LUL
on
August 1, 2023
This standard applies to the Permanent Way system in running lines, depots and sidings. It covers, but is not limited to, the following components of track: a) running rails b) check rails c) rail...
This document is referenced by:
R0049 - Maintenance Assurance Plan (Track) 2014-2015
Published by LUL
on
March 1, 2014
Purpose This Maintenance Assurance Plan (MAP) describes the arrangements for the assurance of London Underground BCV/JNP/SSL maintained Track assets. This plan also references the ongoing maintenance...
This document is referenced by:
G3201 - Maintaining plain line track
Published by LUL
on
March 1, 2014
This handbook covers the preparatory stages of identifying and planning maintenance work (section 4), the necessary safety and protection measures for work on and about the track (section 5) which...
This document is referenced by:
G3206 - Prevention of buckling
Published by LUL
on
April 1, 2014
This handbook covers activities relating to both welded and jointed track, and conductor rails. Purpose The purpose of this handbook is to give guidance on the track installation and maintenance...
This document is referenced by:
G3208 - Emergency track repairs
Published by LUL
on
December 1, 2023
This handbook covers situations where the track is the sole asset category involved, such as broken rails or blockjoint failures, and those which affect more than one category of asset, for example...