UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

LUL - S1135

Premises - Finishes

inactive
Organization: LUL
Publication Date: 1 December 2013
Status: inactive
Page Count: 15
scope:

This standard applies to all new and altered ceilings, roofs, walls, floors, access covers and CMS in all London Underground (LU) premises. These are defined as finishes systems.

The scope of this standard excludes the primary structure to which the finishes systems may be fixed, but includes the fixing elements. Refer to S1063 Civil Engineering - Cutting, grinding, drilling, fixing to and supporting from existing structures.

For surface coatings, refer to G0230 Good Practice Guide for the Application of Surface Coatings to Premises.

For finishes systems' loading requirements refer to S1053 Building and Station Structures.

For building drainage design requirements, refer to S1052 Civil Engineering - Gravity Drainage Systems and S1056 Civil Engineering - Pump Drainage Systems.

Finishes systems shall be designed and specified for the location in which they are to be installed. The requirements of this standard primarily apply to public facing assets. For finishes systems within staff and maintenance areas, the design and specification shall be demonstrably fit for purpose, in accordance with the appropriate standards.

Purpose

The purpose of this standard is to define the performance requirements for finishes systems to ceilings, roofs, walls, floors, access covers and cable management systems (CMS), in public and non-public areas on all LU premises.

Document History

March 1, 2023
Built Environment - finishes
This standard applies to all new and altered finishes as a part of all LU premises. The scope of this standard excludes the primary structure to which the finishes may be fixed but includes the...
September 1, 2017
Premises - Finishes
This standard applies to all new and altered roofs, walls, floors, entrance matting, ceilings, access covers and CMS as a part of all LU premises. The scope of this standard excludes the primary...
September 1, 2017
Premises - Finishes
This standard applies to all new and altered roofs, walls, floors, entrance matting, ceilings, access covers and CMS as a part of all LU premises. The scope of this standard excludes the primary...
September 1, 2017
Premises - Finishes
This standard applies to all new and altered roofs, walls, floors, entrance matting, ceilings, access covers and CMS as a part of all LU premises. The scope of this standard excludes the primary...
S1135
December 1, 2013
Premises - Finishes
This standard applies to all new and altered ceilings, roofs, walls, floors, access covers and CMS in all London Underground (LU) premises. These are defined as finishes systems. The scope of this...
December 1, 2013
Premises - Finishes
This standard applies to all new and altered ceilings, roofs, walls, floors, access covers and CMS in all London Underground (LU) premises. These are defined as finishes systems. The scope of this...

References

Advertisement