UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

PTI - M50.3

Guide Specification for Grouted Post-Tensioning

inactive
Organization: PTI
Publication Date: 1 June 2012
Status: inactive
Page Count: 32
scope:

General description

Furnish complete post-tensioning systems and all required accessories, including but not limited to anchorages, local zone reinforcement, ducts, pipes, strands, and bars from a single supplier, as required. Submit samples, drawings, calculations, procedures, reports, manuals, and certifications. Both temporary and permanent posttensioning shall comply with this specification.

Document History

August 1, 2019
Specification for Multistrand and Grouted Post-Tensioning
This specification is intended to apply to buildings, bridges, storage structures, and other structures using grouted posttensioning tendons, except as follows: stay cables and rock anchors that are...
M50.3
June 1, 2012
Guide Specification for Grouted Post-Tensioning
General description Furnish complete post-tensioning systems and all required accessories, including but not limited to anchorages, local zone reinforcement, ducts, pipes, strands, and bars from a...

References

Advertisement