UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NAVY - OPNAV 3501.334B

(N96) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR AMPHIBIOUS COMMAND SHIP (LCC-20) MOUNT WHITNEY

inactive
Organization: NAVY
Publication Date: 8 April 2014
Status: inactive
Page Count: 117
scope:

Purpose

a. To revise the required operational capabilities (ROC) and projected operational environment (POE) for amphibious command ship (LCC-20) Mount Whitney. This instruction is being reissued with a new date, updated version and signature authority to meet the Chief of Naval Operations' (CNO) age requirememnts for the Office of the Chief of Naval Operations (OPNAV) instructions.

b. This instruction is a complete revision, contains new mission areas, and renaming of anti-air warfare to air warfare (AW), command and control (C2) warfare to information operations (IO), and anti-surface warfare to surface warfare (SUW). Various fleet support operations (FSO) ROC statements were moved to force health protection (FHP) by reference (a) with changes reflected herein.

Document History

May 28, 2021
(N96) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR AMPHIBIOUS COMMAND SHIP MOUNT WHITNEY
Scope and Applicability. Enclosures (1) and (2) have been prepared pursuant with reference (a). The ROC and POE provide the necessary details to describe the mission areas, environment and...
OPNAV 3501.334B
April 8, 2014
(N96) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR AMPHIBIOUS COMMAND SHIP (LCC-20) MOUNT WHITNEY
Purpose a. To revise the required operational capabilities (ROC) and projected operational environment (POE) for amphibious command ship (LCC-20) Mount Whitney. This instruction is being reissued...
February 8, 2005
C PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR USS MOUNT WHITNEY (LCC 20) COMMAND SHIP
A description is not available for this item.
July 29, 1997
C PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR USS MOUNT WHITNEY (LCC 20) COMMAND SHIP
A description is not available for this item.

References

Advertisement