LUL - R0227
Post Lifting Brake Test for Driving Units (A/B & E/F) 92 Tube Stock Quality Plan – Central and Waterloo & City lines
| Organization: | LUL |
| Publication Date: | 1 February 2014 |
| Status: | active |
| Page Count: | 5 |
scope:
This Reference document applies to levels of maintenance as described in Rolling Stock Standard S1180 and scheduled to be completed in the frequency agreed in the Fleet Asset Management Plan and Central and Waterloo Train & City Maintenance Regime. This document lists references to work instructions and completion certificates that are required to be completed when Post Lifting Brake Testing for Driving Units is undertaken.
Purpose
This document has been prepared as a result of the Work Instruction Project and replaces the Quality Plans that existed in the EPIC system (QP10C and QP10W).
Details of the new work instruction titles, references and their former Central Line Fleet Work Instructions (CLFWI) are listed in the Schedule in section 5.
The purpose of this Reference document is to identify which Work Instructions are required to deliver a Post Lifting Brake Testing for Driving Units.
Document History