UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

LUL - R0227

Post Lifting Brake Test for Driving Units (A/B & E/F) 92 Tube Stock Quality Plan – Central and Waterloo & City lines

active, Most Current
Organization: LUL
Publication Date: 1 February 2014
Status: active
Page Count: 5
scope:

This Reference document applies to levels of maintenance as described in Rolling Stock Standard S1180 and scheduled to be completed in the frequency agreed in the Fleet Asset Management Plan and Central and Waterloo Train & City Maintenance Regime. This document lists references to work instructions and completion certificates that are required to be completed when Post Lifting Brake Testing for Driving Units is undertaken.

Purpose

This document has been prepared as a result of the Work Instruction Project and replaces the Quality Plans that existed in the EPIC system (QP10C and QP10W).

Details of the new work instruction titles, references and their former Central Line Fleet Work Instructions (CLFWI) are listed in the Schedule in section 5.

The purpose of this Reference document is to identify which Work Instructions are required to deliver a Post Lifting Brake Testing for Driving Units.

Document History

R0227
February 1, 2014
Post Lifting Brake Test for Driving Units (A/B & E/F) 92 Tube Stock Quality Plan – Central and Waterloo & City lines
This Reference document applies to levels of maintenance as described in Rolling Stock Standard S1180 and scheduled to be completed in the frequency agreed in the Fleet Asset Management Plan and...
Advertisement