LUL - T0440
Tube 4-foot walkway panels
| Organization: | LUL |
| Publication Date: | 1 May 2014 |
| Status: | inactive |
| Page Count: | 8 |
scope:
This technical specification relates to four-foot walkway panels which may be installed to span the drainage channel in tube running tunnels as an alternative to filling the channel with shingle. The tube track concerned may be either sleepered or not.
Purpose
The purpose of this technical specification is to define the performance requirements and acceptance criteria for four-foot walkway panels within the tube environment.
Document History