LUL - G1112

Operation of Tunnel Gauge

inactive
Organization: LUL
Publication Date: 1 December 2011
Status: inactive
Page Count: 6
scope:

This Guidance applies to the Survey and Track Engineering teams within London Underground Survey.

Purpose

The purpose of this Guidance is to detail the methods employed by London Underground Track Engineering and Survey Sections to adopt a safe and systematic process of handling the existing wooden tube tunnel gauge for carrying out gauging survey. It provides guidance on the use of a wooden tube tunnel gauge.

Document History

March 1, 2017
Track engineering - operation of tunnel gauge
This guidance applies to the Survey and Track Engineering teams within LU. Purpose The purpose of this document is to provide guidance on the use of a wooden tube tunnel gauge. This guidance...
G1112
December 1, 2011
Operation of Tunnel Gauge
This Guidance applies to the Survey and Track Engineering teams within London Underground Survey. Purpose The purpose of this Guidance is to detail the methods employed by London Underground Track...