LUL - GN-32016

Signals – Guidance Notes for preparation and completion of Pre-Commissioning Certificate

inactive, Most Current
Organization: LUL
Publication Date: 29 September 2010
Status: inactive
Page Count: 9
scope:

Introduction and Scope

This document has been developed to offer guidance on the development and completion of Pre- Commissioning Certificates (PCC) for local Signal Project Works. The document has been developed in conjunction with a reformat of the PCC, which was resident within the suite of MQAF documents, (old document reference MQAF 039), and incorporates the detail of that form, allowing for greater flexibility in the new template/form (F-31929E).

This document is applicable to all persons within Maintenance, Track & Signals (Signals) who prepare or complete Pre-Commissioning Certificates.

Purpose of the Document

This Guidance Note document provides assistance or clarification on a given procedure, work instruction or form.

Document History

GN-32016
September 29, 2010
Signals – Guidance Notes for preparation and completion of Pre-Commissioning Certificate
Introduction and Scope This document has been developed to offer guidance on the development and completion of Pre- Commissioning Certificates (PCC) for local Signal Project Works. The document has...