UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

SSPC QP 1

Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)

inactive
Buy Now
Organization: SSPC
Publication Date: 1 August 1998
Status: inactive
Page Count: 4
scope:

This procedure describes a method for evaluating the qualifications of industrial field painting contractors and defines a minimum standard for qualification.

The objective of this procedure is to determine if a painting contractor has the personnel, organization, qualifications, procedures, knowledge, and capability to perform surface preparation and coating application of the required quality under the conditions and restrictions specified by the owner for complex structures.

The procedure encompasses the field application of coatings in the industrial market. Specialty applications, such as lining materials, bituminous products, galvanizing, etc., are not covered by the requirements of this standard procedure.

The procedure does not include surface preparation and coating application conducted exclusively at the contractor's facility (i.e., shop painting). Shop painting is covered by the latest revision of SSPC-QP 3, "Standard Procedure for Evaluating the Qualifications of Shop Painting Contractors." Also see Section 6.1 of this standard procedure.

Document History

January 7, 2019
Standard Procedure for Evaluating the Qualifications of Industrial/Marine Painting Contractors (Field Application to Complex Industrial Steel Structures and Other Metal Components)
This procedure describes a method for evaluating the primary qualifications of industrial/marine painting contractors and defines a minimum standard for qualification. The purpose of this procedure...
March 1, 2012
Standard Procedure for Evaluating the Qualifications of Industrial/Marine Painting Contractors (Field Application to Complex Industrial Steel Structures and Other Metal Components)
This procedure describes a method for evaluating the primary qualifications of industrial/marine painting contractors and defines a minimum standard for qualification. The purpose of this procedure...
August 1, 1998
Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)
A description is not available for this item.
SSPC QP 1
August 1, 1998
Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)
This procedure describes a method for evaluating the qualifications of industrial field painting contractors and defines a minimum standard for qualification. The objective of this procedure is to...
January 1, 1989
Standard Procedure for Evaluating Qualifications of Painting Contractors (Field Application to Complex Structures)
A description is not available for this item.

References

Advertisement