The component covered by this specification is intended for use with Cartridge, 20MM, TP, M99A1 and Cartridge, 20mm, TP, M204.
See MIL-A-48078.
See MIL-A-48078. Submit equipment designs as required to Commander, ARDEC ATTN: AMSMC-QAF-I(D), Picatinny Arsenal, NJ 07806-5000.
A process deviation is defined as a change in the approved basic method of manufacture, or an operational change which alters the metallurgical or physical properties of the item.
Where a first article sample is required by the contract, the contracting officer will notify the test facility when to proceed with the metal parts security test. Additional assemblies may be required by the test facility. (See 4.3)
The classification of defects identifies the defect characteristics (among other things) for acceptance inspection. It may be necessary to modify the sequence of inspection stations to best suit the manufacturing process. Inspection for defect characteristics which will be hidden or altered by subsequent processing operations (including unrelated operations), should be scheduled to prevent premature acceptance which would be detrimental to the attainment of optimum product quality of the end item.
Drawings listed in Section 2 of this specification under the heading US Army Armament Research, Development and Engineering Center (ARDEC) may also include drawings prepared by, and identified as Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal, Picatinny Arsenal, US Army Armament Research and Development Command (ARRADCOM) or US Army Armament Research and Development Center (ARDC) drawings. Technical data originally prepared by these activities are now under the cognizance of ARDEC.
The contractor will be responsible for the procurement, manufacture, and maintenance of eddy current equipment and the front slot, rear slot, phase set, and three slot standards IAW the latest drawings called out in the applicable technical data package and the contract. The production check E.C. Standards (PCS No. 1) Dwg. 11075245 will be furnished by the contractor to the Government agency having contract administration responsibility.
Asterisks are not used in this revision to identify changes with respect to the previous issue, due to the extensiveness of the changes.