UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

IEEE 845

Guide for the Evaluation of Human-System Performance in Nuclear Power Generating Stations

active, Most Current
Buy Now
Organization: IEEE
Publication Date: 26 June 1999
Status: active
Page Count: 15
scope:

This document provides guidance for evaluating human-system performance related to systems, equipment, and facilities in nuclear power generating stations. It summarizes specific evaluation techniques and presents rationale for their application within the integrated systems approach to plant design, operations, and maintenance described in IEEE Std 1023-1988 [B3].

Document History

July 1, 2023
Draft Guide for the Evaluation of Human-System Performance in Nuclear Power Generating Stations and Other Nuclear Facilities
This document provides guidance for evaluating human-system performance related to systems, equipment, and facilities1 in nuclear power generating stations and other nuclear facilities. It summarizes...
September 24, 1999
Guide for the Evaluation of Human-System Performance in Nuclear Power Generating Stations
A description is not available for this item.
June 26, 1999
Guide for the Evaluation of Human-System Performance in Nuclear Power Generating Stations
This document provides guidance for evaluating human-system performance related to systems, equipment, and facilities in nuclear power generating stations. It summarizes specific evaluation...
IEEE 845
June 26, 1999
Guide for the Evaluation of Human-System Performance in Nuclear Power Generating Stations
This document provides guidance for evaluating human-system performance related to systems, equipment, and facilities in nuclear power generating stations. It summarizes specific evaluation...
845
November 7, 1988
GUIDE TO EVALUATION OF MAN-MACHINE PERFORMANCE IN NUCLEAR POWER GENERATING STATION CONTROL ROOMS AND OTHER PERIPHERIES (WITHDRAWN)
A description is not available for this item.
January 1, 1988
Guide to Evaluation of Man-Machine Performance in Nuclear Power Generating Station Control Rooms and Other Peripheries
A description is not available for this item.

References

Advertisement