ASME/BPVC - N-691
N-691 Application of Risk-Informed Insights to Increase the Inspection Interval for Pressurized Water Reactor Vessels Section XI, Division 1
inactive, Most Current
| Organization: | ASME/BPVC |
| Publication Date: | 1 July 2004 |
| Status: | inactive |
| Page Count: | 6 |
scope:
The PFM methodology shall include the following considerations:
Document History
N-691
July 1, 2004
N-691 Application of Risk-Informed Insights to Increase the Inspection Interval for Pressurized Water Reactor Vessels Section XI, Division 1
The PFM methodology shall include the following considerations: