UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ASTM International - ASTM B788/B788M-00

Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe

inactive
Buy Now
Organization: ASTM International
Publication Date: 10 May 2000
Status: inactive
Page Count: 6
ICS Code (Drainage systems): 91.140.80
scope:

1.1 This practice describes procedures, soils, and soil placement for the proper installation of corrugated aluminum culverts and storm sewers in either trench or projection installations. A typical trench installation is shown in Fig. 1, and a typical embankment (projection) installation is shown in Fig. 2. The pipes described in this practice are manufactured in a factory and furnished to the job in lengths ordinarily from 10 to 30 ft [3 to 9 m], with 20 ft [6m] being common, for field joining.

1.2 This practice is applicable to either inch-pound units as B788 or to SI units as B788M. Inch-pound units are not necessary equivalent to SI units. SI units are shown in the text in brackets, and they are the applicable values for metric installation.

1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Document History

September 1, 2020
Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe
1.1 This practice describes procedures, soils, and soil placement for the proper installation of corrugated aluminum culverts and storm sewers in either trench or projection installations. A typical...
Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe
1.1 This practice describes procedures, soils, and soil placement for the proper installation of corrugated aluminum culverts and storm sewers in either trench or projection installations. A typical...
November 1, 2009
Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe
1.1 This practice describes procedures, soils, and soil placement for the proper installation of corrugated aluminum culverts and storm sewers in either trench or projection installations. A typical...
October 1, 2004
Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe
1.1 This practice describes procedures, soils, and soil placement for the proper installation of corrugated aluminum culverts and storm sewers in either trench or projection installations. A typical...
ASTM B788/B788M-00
May 10, 2000
Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe
1.1 This practice describes procedures, soils, and soil placement for the proper installation of corrugated aluminum culverts and storm sewers in either trench or projection installations. A typical...
Advertisement