UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

DS 2131.3

Fittings of PEM and PEH for buried gas pipe lines - Inspection of small batches of fittings not inspected by internal regular inspection of production

inactive, Most Current
Organization: DS
Publication Date: 1 January 1982
Status: inactive
Page Count: 2
ICS Code (Plastics pipes and fittings for non fluid use): 83.140.30
ICS Code (Gas supply systems): 91.140.40
scope:

This standard applies to the fitting of PEM and PEH manufactured in such small quantities that they cannot be considered og iginating from current production, or PEM and PEH fittings which have not been subjected to the internal production control as specified in DS 2131.2, clause 7. The field of application of fittings according to this standard corresponds to the field of application specified in DS 2132.2. With the execption of inspection and marking, the requirements for materials .....

Document History

DS 2131.3
January 1, 1982
Fittings of PEM and PEH for buried gas pipe lines - Inspection of small batches of fittings not inspected by internal regular inspection of production
This standard applies to the fitting of PEM and PEH manufactured in such small quantities that they cannot be considered og iginating from current production, or PEM and PEH fittings which have not...
Advertisement