UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ASTM International - ASTM F3312/F3312M-18

Standard Practice for Liquefied Natural Gas (LNG) Bunkering Hose Transfer Assembly

inactive
Buy Now
Organization: ASTM International
Publication Date: 15 June 2018
Status: inactive
Page Count: 8
ICS Code (Petroleum products and natural gas handling equipment): 75.200
significance And Use:

4.1 This practice provides guidance on the minimum requirements for the design, manufacture, installation, and operation of bunker hose transfer assemblies for cryogenic service pertaining to... View More

scope:

1.1 This practice covers the minimum requirements for the design, manufacturing, and deployment of bunker hose transfer assemblies for cryogenic service pertaining to bunkering of liquefied natural gas (LNG)-fueled vessels. The bunker hose transfer assemblies addressed by this practice are for connections between the LNG-fueled vessel bunker manifold presentation flange connections and the LNG supplier bunkering manifold presentation flange connections.

1.2 Transfer assemblies are suitable for use in multiple maritime bunkering applications, including but not limited to facilities, vessels, trucks, and other LNG bunkering supply services. This practice will directly address the hose assembly, dry quick disconnect couplings (DQD), breakaway couplings, gaskets, insulating flange, strainers, and associated fittings.

1.3 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.

1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Document History

December 1, 2023
Standard Practice for Liquefied Natural Gas (LNG) Bunkering Hose Transfer Assembly
1.1 This practice covers the minimum requirements for the design, manufacturing, and deployment of bunker hose transfer assemblies for cryogenic service pertaining to bunkering of liquefied natural...
ASTM F3312/F3312M-18
June 15, 2018
Standard Practice for Liquefied Natural Gas (LNG) Bunkering Hose Transfer Assembly
1.1 This practice covers the minimum requirements for the design, manufacturing, and deployment of bunker hose transfer assemblies for cryogenic service pertaining to bunkering of liquefied natural...
Advertisement