UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

AASHTO - HB-17 DIVISION II SEC 3

Division II Construction - Temporary Works

active, Most Current
Organization: AASHTO
Publication Date: 1 January 2002
Status: active
Page Count: 6
scope:

Description

This work shall consist of the construction and removal of temporary facilities which are generally designed by the Contractor and employed by the Contractor in the execution of the work and whose failure to perform properly could adversely affect the character of the contract work or endanger the safety of adjacent facilities, property, or the public. Appropriate reductions in allowable stresses or loads shall be used for design when other than new or undamaged materials are to be used. Such facilities include, but are not limited to, falsework, forms and form travelers, cofferdams, shoring, water control systems, and temporary bridges.

The following publications are useful reference documents in the preparation of specifications for the design, review and inspection of temporary works:

Synthesis of Falsework, Formwork, and Scaffolding for Highway Bridge Structures, November 1991, (FHWA-RD-91-062)

Guide Standard Specification's for Bridge Temporary Works, November 1993, (FHWA-RD-93-031)

Guide Design Specification for Bridge Temporary Works, November 1993, (FHWA-RD-93-032)

Certification Program for Bridge Temporary Works, November 1993, (FHWA-RD-93-033)

Construction Handbook for Bridge Temporary Works, November 1993, (FHWA-RD-93-034)

Document History

HB-17 DIVISION II SEC 3
January 1, 2002
Division II Construction - Temporary Works
Description This work shall consist of the construction and removal of temporary facilities which are generally designed by the Contractor and employed by the Contractor in the execution of the work...
January 1, 1996
Temporary Works
A description is not available for this item.
January 1, 1996
Temporary Works
A description is not available for this item.

References

Advertisement