NAVY - UFGS-33 63 14
EXTERIOR BURIED PUMPED CONDENSATE RETURN
active, Most Current
| Organization: | NAVY |
| Publication Date: | 1 April 2006 |
| Status: | active |
| Page Count: | 16 |
scope:
This guide specification covers the requirements for Contractor designing and providing buried factory-prefabricate
Document History
UFGS-33 63 14
April 1, 2006
EXTERIOR BURIED PUMPED CONDENSATE RETURN
This guide specification covers the requirements for Contractor designing and providing buried factory-prefabricated preinsulated pumped condensate piping systems for server ground water conditions.