NACE - RP0775
Preparation and Installation of Corrosion Coupons and Interpretation of Test Data in Oilfield Operations
inactive
| Organization: | NACE |
| Publication Date: | 1 January 1991 |
| Status: | inactive |
| Page Count: | 14 |
Document History
February 9, 2023
Preparation, Installation, Analysis, and Interpretation of Corrosion Coupons in Hydrocarbon Operations
This standard outlines procedures for preparing, installing, and analyzing metallic corrosion coupons. Factors considered in the interpretation of results obtained from these corrosion coupons are...
June 25, 1999
Preparation, Installation, Analysis, and Interpretation of Corrosion Coupons in Oilfield Operations
General
This standard is presented for the use of corrosion coupons in oilfield drilling, production, and transportation operations. Oilfield operations include oil-, water-, and gashandling...
June 25, 1999
Preparation, Installation, Analysis, and Interpretation of Corrosion Coupons in Oilfield Operations
This standard is presented for the use of corrosion coupons in oilfield drilling, production, and transportation operations. Oilfield operations include oil-, water-, and gas-handling systems, and...
June 25, 1999
Preparation, Installation, Analysis, and Interpretation of Corrosion Coupons in Oilfield Operations
General
This standard is presented for the use of corrosion coupons in oilfield drilling, production, and transportation operations. Oilfield operations include oil-, water-, and gas-handling...
RP0775
January 1, 1991
Preparation and Installation of Corrosion Coupons and Interpretation of Test Data in Oilfield Operations
A description is not available for this item.