MODUK - DEF STAN 59-41: PT 3: SUPP B
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement B: Test Method DCE02 Conducted Emission on Control and Signal Lines 20Hz - 150MHz
inactive
| Organization: | MODUK |
| Publication Date: | 9 July 1993 |
| Status: | inactive |
| Page Count: | 10 |
scope:
The purpose of this test is to ensure that the common mode conducted emissions on all control, signal and power lines to the equipment under test (EUT) are controlled to the appropriate limits in order to provide adequate protection to radio reception and to minimize disturbance to any sensitive electronic equipment.
Document History
January 1, 1995
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement B: Test Method DCE02 Conducted Emission on Control Signal and Power Lines 20 Hz - 150 MHz
Purpose
The purpose of this test is to ensure that the common mode conducted emissions on all control, signal and power lines to the equipment under test (EUT) are controlled to the appropriate...
September 30, 1994
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement B: Test Method DCE02 Conducted Emission on Control, Signal and Power Lines (Common Mode) 20 Hz - 150 MHz
The purpose of this test is to ensure that the common mode conducted emissions on all control, signal and power lines to the equipment under test (EUT) are controlled to the appropriate limits in...
DEF STAN 59-41: PT 3: SUPP B
July 9, 1993
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement B: Test Method DCE02 Conducted Emission on Control and Signal Lines 20Hz - 150MHz
The purpose of this test is to ensure that the common mode conducted emissions on all control, signal and power lines to the equipment under test (EUT) are controlled to the appropriate limits in...