UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ACI 211.3R

Guide for Selecting Proportions for No-Slump Concrete

inactive
Buy Now
Organization: ACI
Publication Date: 30 September 1997
Status: inactive
Page Count: 30

Document History

January 1, 2002
Guide for Selecting Proportions for No-Slump Concrete
ACI 211.1 provides methods for proportioning concrete with slumps greater than 25 mm (1 in.) as measured by ASTM C 143/C 143M. This guide is an extension of ACI 211.1 and addresses the proportioning...
January 1, 2002
Guide for Selecting Proportions for No-Slump Concrete
ACI 211.1 provides methods for proportioning concrete with slumps greater than 25 mm (1 in.) as measured by ASTM C 143/C 143M. This guide is an extension of ACI 211.1 and addresses the proportioning...
ACI 211.3R
September 30, 1997
Guide for Selecting Proportions for No-Slump Concrete
A description is not available for this item.

References

Advertisement