MODUK - DEF STAN 59-41: PT 3: SUPP M
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement M: Test Method DCS06 Imported Long Transient Susceptibility (Land Service) AC and DC Systems
inactive
| Organization: | MODUK |
| Publication Date: | 30 September 1994 |
| Status: | inactive |
| Page Count: | 10 |
scope:
Purpose
The purpose of this test is to ensure that transients typical of those produced by Group Switching of equipment's on the power supply lines will not damage the EUT.
Document History
January 1, 1995
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement M: Test Method DCS06 Imported Long Transients Susceptibility (Land Service) AC and DC Systems
Purpose
The purpose of this test is to ensure that transients typical of those produced by Group Switching of equipments on the power supply lines will not damage the EUT.
DEF STAN 59-41: PT 3: SUPP M
September 30, 1994
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement M: Test Method DCS06 Imported Long Transient Susceptibility (Land Service) AC and DC Systems
Purpose
The purpose of this test is to ensure that transients typical of those produced by Group Switching of equipment's on the power supply lines will not damage the EUT.
July 9, 1993
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement M: Test Method DCS06 Imported Long Transient Susceptibility 28 Volt Systems (Land Service)
Purpose
The purpose of this test is to ensure that transients typical of those produced by Group Switching of equipment's on the power supply lines will not damage the EUT.