UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ANS - 58.8

TIME RESPONSE DESIGN CRITERIA FOR NUCLEAR SAFETY RELATED OPERATOR ACTIONS

inactive
Organization: ANS
Publication Date: 14 September 1984
Status: inactive
Page Count: 18
scope:

This standard establishes criteria for determining the minimum time response to be used for nuclear-safety-related operator actions to mitigate design basis events as set forth in safety analysis reports (SAR). These criteria specify time test requirements that shall be met for credit to be taken in the design and nuclear-safety analysis for operator actions to initiate, to control, or to initiate and control nuclear-safety system actions.

Specifically, they establish:

(1) Certain requirements for determining whether a particular action to initiate or adjust a nuclear-safety system may be accomplished by operator action or must be accomplished by automatic protection system or system redesign.

(2) A basis for determining when design modifications can obviate the need for automatic protective actions that would otherwise be required.

(3) Functional guidelines for the hardware, such as instrumentation, controls, indicators, and annunciators necessary to support the nuclearsafety- related operator actions.

Document History

January 1, 2019
Time Response Criteria for Manual Actions at Nuclear Power Plants
This standard1) establishes criteria and methods for identifying, calculating, validating, tracking, and documenting time requirements for the performance of nuclear power plant time-limited manual...
January 1, 1994
Time Response Design Criteria for Safety-Related Operator Actions
This standard establishes time response design criteria for safety-related operator actions to be used in the design of light water reactor (LWR) nuclear power plants. The criteria are used to...
January 1, 1994
Time Response Design Criteria for Safety-Related Operator Actions
This standard establishes time response design criteria for safety-related operator actions to be used in the design of light water reactor (LWR) nuclear power plants. The criteria are used to...
January 1, 1994
Time Response Design Criteria for Safety-Related Operator Actions
This standard establishes time response design criteria for safety-related operator actions to be used in the design of light water reactor (LWR) nuclear power plants. The criteria are used to...
January 1, 1994
Time Response Design Criteria for Safety-Related Operator Actions
This standard establishes time response design criteria for safety-related operator actions to be used in the design of light water reactor (LWR) nuclear power plants. The criteria are used to...
58.8
September 14, 1984
TIME RESPONSE DESIGN CRITERIA FOR NUCLEAR SAFETY RELATED OPERATOR ACTIONS
This standard establishes criteria for determining the minimum time response to be used for nuclear-safety-related operator actions to mitigate design basis events as set forth in safety analysis...

References

Advertisement