UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

GMNA - DESIGN VOL 2 C3

Electronic Math Model and Drawing Data Creation Standard Drawing Data Organization - Format Requirements

inactive
Organization: GMNA
Publication Date: 1 June 2001
Status: inactive
Page Count: 5
scope:

1 Scope.

This standard establishes the principles for defining workpieces on technical drawings using orthographic projection methods. The "arrow method", which eliminates the need for first angle and third angle projection, is described in this standard and will be used on all GM product drawings.

Document History

March 1, 2013
Electronic Math Model and Drawing Data Creation Standard Drawing Data Organization – Drawing Views and Sections
A description is not available for this item.
April 1, 2002
Electronic Math Model and Drawing Data Creation Standard Drawing Data Organization - Drawing Views and Sections
1 Scope. This standard establishes the principles for defining workpieces on technical drawings using orthographic projection methods. The "arrow method", which eliminates the need for first angle...
DESIGN VOL 2 C3
June 1, 2001
Electronic Math Model and Drawing Data Creation Standard Drawing Data Organization - Format Requirements
1 Scope. This standard establishes the principles for defining workpieces on technical drawings using orthographic projection methods. The "arrow method", which eliminates the need for first angle...

References

Advertisement