UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

MODUK - DEF STAN-59-41 PT 3 SEC 3

Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Section 3: LRU and Sub Systems (Including Land Vehicle Installed Antenna Test)

inactive
Buy Now
Organization: MODUK
Publication Date: 16 May 2003
Status: inactive
Page Count: 164
scope:

This Section defines the three Service requirements for EMC tests at Line Replacement Unit (LRU) and sub-system level, to limit the propagation of unintentional electromagnetic energy whether conducted or radiated, internally or externally to a weapon platform, military vehicle, ship or aircraft and to limit any susceptibility of LRU or subsystems to the internal or external operational electromagnetic environments of the weapon platform, in which the equipment will be fitted.

This Section also includes some simulated NEMP, lightning strike and electrostatic discharge tests at LRU or sub-system level.

Document History

DEF STAN-59-41 PT 3 SEC 3
May 16, 2003
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Section 3: LRU and Sub Systems (Including Land Vehicle Installed Antenna Test)
This Section defines the three Service requirements for EMC tests at Line Replacement Unit (LRU) and sub-system level, to limit the propagation of unintentional electromagnetic energy whether...

References

Advertisement