DOT - FAA-E-2496/3
ESTABLISHMENT OF AIR ROUTE SURVEILLANCE RADAR (ARSR) SYSTEMS PART 3 ON-SITE INSTALLATION AND TEST OF ARSR SYSTEM ELECTRONIC AND PLANT EQUIPMENT PACKAGES AND ACCEPTANCE
| Organization: | DOT |
| Publication Date: | 16 November 1971 |
| Status: | active |
| Page Count: | 12 |
scope:
This part contains the requirements for the on-site installation, alignment, test, and acceptance of the ARSR radar integrated electronic system package described in Part 1 of this specification and the standby engine generator subsystems, transportable buildings, antenna radome, and radar tower described in Part 2 of this specification. Requirements are also given for test and acceptance.
Document History