NAVY - OPNAV 3501.143A
C(N86 0690LP1992900) PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR VULCAN (AR 5) CLASS REPAIR SHIPS (U)
inactive
| Organization: | NAVY |
| Publication Date: | 10 November 1987 |
| Status: | inactive |
| Page Count: | 35 |
Document History
March 10, 1989
C(N86 0690LP1992900) PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR VULCAN (AR 5) CLASS REPAIR SHIPS (U)
A description is not available for this item.
OPNAV 3501.143A
November 10, 1987
C(N86 0690LP1992900) PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR VULCAN (AR 5) CLASS REPAIR SHIPS (U)
A description is not available for this item.