UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

MSFC - NASA MWI 8730.2 REV C

TEMPORARILY INSTALLED HARDWARE CONTROL

inactive
Organization: MSFC
Publication Date: 30 September 2004
Status: inactive
Page Count: 11
scope:

PURPOSE. To meet the requirements of MPD 1280.1, "Marshall Management Manual" (MMM), for inspection and test to provide traceability in defining requirements for in-house control of temporarily installed hardware items in flight and flight-associated systems, and the subsequent preflight removal of those items.

APPLICABILITY. This Instruction shall apply to all personnel responsible for installing or removing temporarily installed hardware defined by engineering documentation with stipulations for pre-flight removal. This system shall be implemented at final assembly of flight article at Marshall Space Flight Center (MSFC) or upon receipt from contractor and shall be maintained at all times while the hardware is within MSFC. In cases where engineering documentation invokes temporarily installed hardware prior to, or subsequent to, final assembly, this Instruction shall apply.

Document History

TEMPORARILYINSTALLED HARDWARE CONTROL With Change 1 (12/30/14)
PURPOSE The purpose of this Marshall Work Instruction (MWI) is to meet the requirements of MPD 1280.1, “MSFC QualityManagement System Policy,” for inspection and test to provide traceability in...
TEMPORARILY INSTALLED HARDWARE CONTROL With Change 2 (5/3/22)
PURPOSE The purpose of this MWI is to meet the requirements of MPD 1280.1 for inspection and test to provide traceability in defining requirements for in-house control of temporarily-installed...
July 7, 2010
TEMPORARILY - INSTALLED HARDWARE CONTROL
PURPOSE The purpose of this Marshall Work Instruction (MWI) is to meet the requirements of MPD 1280.1, "Marshall Quality Management System Manual," for inspection and test to provide traceability in...
July 12, 2007
TEMPORARILY INSTALLED HARDWARE CONTROL
PURPOSE The purpose of this Marshall Work Instruction (MWI) is to meet the requirements of MPD 1280.1, "Marshall Quality Management System Manual," for inspection and test to provide traceability in...
NASA MWI 8730.2 REV C
September 30, 2004
TEMPORARILY INSTALLED HARDWARE CONTROL
PURPOSE. To meet the requirements of MPD 1280.1, "Marshall Management Manual" (MMM), for inspection and test to provide traceability in defining requirements for in-house control of temporarily...
January 16, 2002
TEMPORARILY INSTALLED HARDWARE CONTROL
PURPOSE. To meet the requirements of MPD 1280.1, "Marshall Management Manual" (MMM), for inspection and test to provide traceability in defining requirements for in-house control of temporarily...
August 18, 1999
TEMPORARILY INSTALLED HARDWARE CONTROL
PURPOSE To meet the requirements of MPD 1280.1, "Marshall Management Manual" (MMM), for inspection and test to provide traceability in defining requirements for in-house control of temporarily...