UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ACI 325.11R

Accelerated Techniques for Concrete Paving

inactive
Buy Now
Organization: ACI
Publication Date: 1 January 2001
Status: inactive
Page Count: 18
scope:

General

Airport authorities and road agencies face major challenges from increasing traffic volumes on existing airports, roadways, and urban streets. Owners must repair or replace deteriorated pavements while maintaining traffic on these structures. Traditional pavement construction, repair, or replacement solutions may no longer be universally acceptable due to increasing public impatience with traffic interruption. Traditional solutions are especially inappropriate in urban areas where congestion is severe. Accelerated construction techniques for portland cement concrete pavement resolve these problems by providing quick public access to a highquality, long-lasting pavement. Accelerated construction techniques are suitable for new construction, reconstruction, or resurfacing projects. Accelerated construction for concrete paving is often referred to as "fast-track" concrete paving. Accelerated paving encompasses two classes of activities: technological methods to accelerate the rate of strength gain and contractual methods to minimize the construction time.

Many methods exist to accelerate pavement construction. Two traditional acceleration methods are time incentives and penalties for project completion. Agencies have been using these time-of-completion incentives for many years, and often contractors will meet these requirements by lengthening the work day or increasing the size of construction crews. Using accelerated paving techniques, a contractor often can complete a project without increasing crew size or changing normal labor schedules.

Document History

March 1, 2019
Report on Accelerated Techniques for Concrete Paving
Concrete mixtures used in accelerated concrete pavement construction may be more susceptible to durability-related distress than conventional concrete. Further, the ability to detect...