TIA-102.BAAD
APCO Project 25 Common Air Interface Operational Description for Conventional Channels
inactive
Buy Now
| Organization: | TIA |
| Publication Date: | 1 October 1994 |
| Status: | inactive |
| Page Count: | 34 |
Document History
July 28, 2015
Project 25 Conventional Procedures
This document specifies the procedures for conventional LMR systems that permit the conveyance of digital voice, data packets, and supplementary data messages over the common air interface, and...
February 1, 2010
Project 25 Conventional Procedures
Project 25 digital radio systems support a conventional mode of operation. This document provides details of the procedures required such that, where systems are configured in the conventional mode,...
March 1, 2008
Common Air Interface Description for Conventional Channels Addendum 1 – Packet Data Registration/OTAR Messages and Procedures
This supplement defines sample operational procedures for basic conventional radio systems. A conventional radio system is one that does not include any controlling entity in the infrastructure to...
December 1, 2003
Project 25 Common Air Interface Description for Conventional Channels
This supplement defines sample operational procedures for basic conventional radio systems. A conventional radio system is one that does not include any controlling entity in the infrastructure to...
TIA-102.BAAD
October 1, 1994
APCO Project 25 Common Air Interface Operational Description for Conventional Channels
A description is not available for this item.