UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

PIP STS03600

Nonshrink Cementitious Grout Specification

inactive
Buy Now
Organization: PIP
Publication Date: 1 June 2002
Status: inactive
Page Count: 8
scope:

The contractor shall furnish all equipment, materials, labor, and supervision and shall perform all operations necessary for the formwork, proper mixing, placing, finishing, and curing of "nonshrink" cementitious grout, hereafter referred to as grout, where indicated by the contract documents.

Any conflicts or inconsistencies between this Practice, the design drawings, the grout manufacturer's specifications and recommendations, or other contract documents shall be brought to the attention of the buyer for resolution before the work begins.

This document is a complete revision of PIP STS03600 - Cementitious Grout Specification, and therefore revision markings are not provided.

Purpose

This Practice provides the contractor with a specification for the supply and installation of "non-shrink" cementitious grout for equipment and structural column base plates. Refer to PIP STS03601 for epoxy grout specifications.

 

Document History

December 1, 2021
Application of ACI 351.4-14, Specification for Installation of Cementitious Grouting between Foundations and Equipment Bases
This Practice supplements ACI 351.4-14, Specification for Installation of Cementitious Grouting between Foundations and Equipment Bases. Together, this Practice and ACI 351.4-14 provide requirements...
July 1, 2008
Nonshrink Cementitious Grout Specification
This Practice describes the requirements for supplying, testing, and installing "nonshrink" cementitious grout materials. Purpose This Practice provides the requirements for "non-shrink"...
PIP STS03600
June 1, 2002
Nonshrink Cementitious Grout Specification
The contractor shall furnish all equipment, materials, labor, and supervision and shall perform all operations necessary for the formwork, proper mixing, placing, finishing, and curing of “nonshrink”...