VA - FED H-08-1 SEC 01310
NETWORK ANALYSIS SYSTEM (P3, PDM FORMAT)
| Organization: | VA |
| Publication Date: | 1 April 2005 |
| Status: | active |
| Page Count: | 14 |
scope:
DESCRIPTION:
A. The Contractor shall develop a Network Analysis System (NAS) plan and schedule demonstrating fulfillment of the contract requirements, shall keep the network up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Conventional Critical Path Method (CPM) Precedence Diagramming Method (PDM) technique will be utilized to satisfy both time and cost applications. All schedule data and reports required under this specification section shall be based upon regular total float, not relative total float schedules.