scope:
1.2 SCOPE:
1.2.1 This Recommended Practice addresses the fundamental procedures for sizing and selecting electric submersible pumps and related equipment for various well conditions.
1.2.2 This Recommended Practice is specifically prepared for installations in oil and/or water producing wells where the equipment is installed on tubing.
Document History
July 1, 2002
Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations
Each component of the ESP system (pump, motor, intake, seal or protector, cable, switchboard, etc.) is discussed in some detail as far as what must be considered for the best selection at a desired...
July 1, 2002
Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations
Each component of the ESP system (pump, motor, intake, seal or protector, cable, switchboard, etc.) is discussed in some detail as far as what must be considered for the best selection at a desired...
July 1, 2002
Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations
Each component of the ESP system (pump, motor, intake, seal or protector, cable, switchboard, etc.) is discussed in some detail as far as what must be considered for the best selection at a desired...
API RP 11S4
January 1, 1993
Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations
1.2 SCOPE: 1.2.1 This Recommended Practice addresses the fundamental procedures for sizing and selecting electric submersible pumps and related equipment for various well conditions. 1.2.2 This...