COE ETN 78-7 SUPPLEMENT 1
FACILITIES ENGINEERING MAINTENANCE AND REPAIR LIFE CYCLE COST STUDY OF PAINTING EXISTING SIDING VERSUS OVERLAYING EXISTING SIDING WITH PREFABRICATED SIDING
active, Most Current
| Organization: | COE |
| Publication Date: | 1 April 1978 |
| Status: | active |
| Page Count: | 2 |
Document History
COE ETN 78-7 SUPPLEMENT 1
April 1, 1978
FACILITIES ENGINEERING MAINTENANCE AND REPAIR LIFE CYCLE COST STUDY OF PAINTING EXISTING SIDING VERSUS OVERLAYING EXISTING SIDING WITH PREFABRICATED SIDING
A description is not available for this item.
February 1, 1978
FACILITIES ENGINEERING MAINTENANCE AND REPAIR LIFE CYCLE COST STUDY OF PAINTING EXISTING SIDING VERSUS OVERLAYING EXISTING SIDING WITH PREFABRICATED SIDING
A description is not available for this item.