FAA-C-2811
RCL BUILDING SPECIFICATIONS AND DRAWINGS
active, Most Current
| Organization: | FAA |
| Publication Date: | 31 May 1987 |
| Status: | active |
| Page Count: | 45 |
scope:
Design, fabricate, assemble, transport and install at the site(s) precast concrete equipment shelter(s) complete including: interior finish materials, exterior door, frame, hardware, drip cap, HVAC equipment, electrical equipment and fixtures.
Document History
FAA-C-2811
May 31, 1987
RCL BUILDING SPECIFICATIONS AND DRAWINGS
Design, fabricate, assemble, transport and install at the site(s) precast concrete equipment shelter(s) complete including: interior finish materials, exterior door, frame, hardware, drip cap, HVAC...