NR/L2/SIG/30014/D120/HS60
Signalling Works Testing Handbook: Point End Inspection and Mechanical Set Up Handover Specification
inactive
Buy Now
| Organization: | NR |
| Publication Date: | 6 September 2014 |
| Status: | inactive |
| Page Count: | 1 |
scope:
General
This handover specification sets out the process, requirements and responsibilities for the mechanical setting up of points and the subsequent handover from signalling installation to Signalling Works Testing.
General definitions of terms are given in NR/L2/SIG/30014/E110
Document History
December 5, 2020
Signalling Works Testing Handbook: Point End Inspection and Mechanical Set Up Handover Specification
A description is not available for this item.
NR/L2/SIG/30014/D120/HS60
September 6, 2014
Signalling Works Testing Handbook: Point End Inspection and Mechanical Set Up Handover Specification
General
This handover specification sets out the process, requirements and responsibilities for the mechanical setting up of points and the subsequent handover from signalling installation to...