UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NPFC - DI-SAFT-80103

ENGINEERING CHANGE PROPOSAL SYSTEM SAFETY REPORT (ECPSSR)

active, Most Current
Buy Now
Organization: NPFC
Publication Date: 12 June 2015
Status: active
Page Count: 1
scope:

Use/Relationship: The Engineering Change Proposal System Safety Report (ECPSSR) is used to summarize results of analyses, tests and trade-off studies conducted on proposed engineering design changes throughout the system life cycle.

a. This Data Item Description (DID) contains the content and format preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This DID is related to DI-SAFT-80101, System Safety Hazard Analysis Report (SSHAR); DI-SAFT-80102, Safety Assessment Report (SAR); DI-SAFT-80104, Waiver or Deviation System Safety Report (WDSSR); DI-SAFT-80105, System Safety Program Progress Report (SSPPR); and DI-SAFT-80106, Health Hazard Assessment Report (HHAR). (Copies of these DIDs are available online at http://quicksearch.dla.mil.)

c. This DID supersedes DI-SAFT-80103B.

Document History

DI-SAFT-80103
June 12, 2015
ENGINEERING CHANGE PROPOSAL SYSTEM SAFETY REPORT (ECPSSR)
Use/Relationship: The Engineering Change Proposal System Safety Report (ECPSSR) is used to summarize results of analyses, tests and trade-off studies conducted on proposed engineering design changes...
May 28, 2014
Engineering Change Proposal System Safety Report (ECPSSR)
A description is not available for this item.
July 31, 1995
ENGINEERING CHANGE PROPOSAL SYSTEM SAFETY REPORT (ECPSSR)
DESCRIPTION/PURPOSE This ECPSSR can be used to summarize results of analyses, tests and tradeoff studies conducted on proposed engineering design changes throughout the system life cycle.
January 19, 1993
ENGINEERING CHANGE PROPOSAL SYSTEM SAFETY REPORT (ECPSSR)
A description is not available for this item.
January 20, 1986
ENGINEERING CHANGE PROPOSAL SYSTEM SAFETY REPORT (ECPSSR)
A description is not available for this item.

References

Advertisement