NG SCT 53
Site Commissioning Tests - Gas Insulated Transmission Line (GIL) Systems
active, Most Current
Buy Now
| Organization: | NG |
| Publication Date: | 1 May 2012 |
| Status: | active |
| Page Count: | 10 |
scope:
PURPOSE AND SCOPE
This document contains the National Grid specified site commissioning tests and checks to be performed on the installation of a gas insulated transmission line (GIL) system using GIL to TS 3.2.13 "Gas Insulated Transmission Line". The supplier is to specify any amendments or additional site commissioning tests and checks that are required.
Document History
NG SCT 53
May 1, 2012
Site Commissioning Tests - Gas Insulated Transmission Line (GIL) Systems
PURPOSE AND SCOPE
This document contains the National Grid specified site commissioning tests and checks to be performed on the installation of a gas insulated transmission line (GIL) system using...