UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NG SCT 47

Site Commissioning Tests - Mechanically Switched Capacitors

active, Most Current
Buy Now
Organization: NG
Publication Date: 1 December 2005
Status: active
Page Count: 9
scope:

PURPOSE AND SCOPE

This document details, in general terms, a range of checks and performance tests on Mechanically Switched Capacitor (MSC) equipment which are considered to be the minimum tests that are necessary prior to hand over of the equipment to National Grid. Contractors may perform additional tests to those specified in this document. Commissioning requirements for control and protection systems are not within the scope of this document.

Document History

NG SCT 47
December 1, 2005
Site Commissioning Tests - Mechanically Switched Capacitors
PURPOSE AND SCOPE This document details, in general terms, a range of checks and performance tests on Mechanically Switched Capacitor (MSC) equipment which are considered to be the minimum tests...

References

Advertisement