NR/L3/ELP/29987/MOD09 ISSUE 4
Working On or About 25 kV A.C. Electrified Lines: Isolation and Earthing when Constructing or Dismantling Overhead Line Equipment - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
| Organization: | NR |
| Publication Date: | 5 September 2015 |
| Status: | inactive |
| Page Count: | 5 |
scope:
This module states the requirements for constructing overhead line equipment, working on new overhead line equipment and dismantling existing overhead line equipment.
It is applicable to Network Rail personnel and to Network Rail's contractors.
To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.
Purpose
This module will produce consistent arrangements for dealing with new overhead line equipment, overhead line equipment under construction and redundant existing overhead line equipment being dismantled so that the general requirements for working on or about 25 kV a.c. electrified lines are not prejudiced. Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC).
Document History