NG UKBP/TP 131

UK Business Procedure/Transmission Procedures - Settlement Metering

active, Most Current
Buy Now
Organization: NG
Publication Date: 1 April 2015
Status: active
Page Count: 12
scope:

PURPOSE AND SCOPE

The purpose of this procedure is to ensure that:

• Settlement Metering installations comply with all the relevant standards.

• All documentation is satisfactorily completed and presented to relevant parties in an accurate and timely manner (Appendix A).

• Actions are carried out by the relevant responsible parties to achieve correct and timely completion of Settlement Metering installations (Appendix A).

• Planning, interfaces, standards, time scales and implementation of Settlement Metering Schemes are identified, and to ensure individuals involved in such Schemes are aware of their responsibilities.

• This Procedure covers Settlement Metering requirements at Grid Exit (Supply) Points and Grid Entry Points. The procedure is only applicable to schemes where the requirement for Settlement Metering has been clearly identified; or if the project involves the up-rating of plant resulting in the change of capacity for a given metered supply. In the case of Grid Entry Points the Generator Company (Registrant) may decide to own and provide their own Settlement Metering.

• Responsibility for registering new boundary points with ELEXON rests with Compliance and Notifications Team within Network Service (TNS). The overall responsibility for National Grid's interface with ELEXON remains with Commercial Frameworks (TNS).

Responsibility for registering the associated boundary point metering system rests with the Registrant (Generator, Distribution System Operator (DSO) or directly connected customer).

It should be noted that replacement of SGTs or changes to plant ratings are to be assessed for their impact on the metering system. Such changes may result in minor alterations to the metering system, and should be undertaken by a Meter Operator Agent who will be contracted by National Grid to undertake any minor works. Such minor alterations are not relevant to the Settlement Metering process outlined in this document, but may require a new or updated registration form.

Specifically excluded from the scope of this document is OFTO metering and metering for site supplies. Responsibility for the supply and registration of site supply metering equipment rests solely

Document History

April 1, 2015
UK Business Procedure/Transmission Procedures - Settlement Metering
PURPOSE AND SCOPE The purpose of this procedure is to ensure that: • Settlement Metering installations comply with all the relevant standards. • All documentation is satisfactorily completed and...
NG UKBP/TP 131
April 1, 2015
UK Business Procedure/Transmission Procedures - Settlement Metering
PURPOSE AND SCOPE The purpose of this procedure is to ensure that: • Settlement Metering installations comply with all the relevant standards. • All documentation is satisfactorily completed and...