UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ARMY - AR TM 5-690

GROUNDING AND BONDING IN COMMAND, CONTROL, COMMUNICATIONS, COMPUTER, INTELLIGENCE, SURVEILLANCE, AND RECONNAISSANCE (C4ISR) FACILITIES

active, Most Current
Organization: ARMY
Publication Date: 15 February 2002
Status: active
Page Count: 183
scope:

The scope of this manual is to provide general guidance for design, construction, modification, inspection, and acceptance testing of the grounding and bonding subsystems for building protection, electrical power ground fault protection, lightning protection, and signal ground protection for both new and existing C4ISR facilities. The procedures presented in this manual are basic. Detailed information and specific instructions for each particular project should be observed.

Purpose

The purpose of this manual is to present an integrated set of design and installation requirements for grounding and bonding practices in new and existing Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4ISR) facilities. Grounding and bonding alone will not and cannot guarantee absolute protection against electromagnetic (EM) environmental threats. Improper grounding and bonding practices, however, can negate the effectiveness of other protective measures, such as EM protection, TEMPEST protection, shielding, and surge suppression.

a. EM protection. EM protection requirements are intended to limit the spurious emissions given off by electronic equipment and to ensure that electronic equipment is not adversely affected by such emissions. Typical EM requirements are contained in CFR 47 or in documents promulgated by Technical Committee 77 (Electromagnetic Compatibility) of the International Electrotechnical Commission (IEC).

b. TEMPEST protection. Transient electromagnetic pulse emanation standard (TEMPEST) protection is a government standard with the purpose of protecting the compromising emanations from any information processing equipment from the possibility of interception and extraction of classified information by unauthorized parties.

c. EM and TEMPEST grounding and bonding practices. A Faraday cage that provides an electromagnetic and radio frequency shield enveloping the electronic equipment to be protected best describes the basic requirements of EM and TEMPEST protection. This shield isolates the protected circuits from spurious external signals and also attenuates TEMPEST emanations to levels that are too small to be intercepted or analyzed. To be usable this shield must have penetrations for personnel and equipment access, power lines, control cables, and ventilation. The number of shield penetrations must be held to a minimum since each penetration is a potential leakage source unless properly grounded and bonded. Shielding hardware and a power distribution system designed to meet the objectives of EM and TEMPEST protection guidelines must always meet the requirements of the National Electrical Code®, NFPA 70-1999 (NEC®). In particular, the grounding and bonding of shields and associated components must comply with Article 250 of the NEC®. (National Electrical Code® and NEC® are registered trademarks of the National Fire Protection Association Inc., Quincy, MA 02269.)

d. Recommended grounding and bonding practices. The recommended grounding and bonding practices are designed to: (1) accomplish adequate fault and lightning protection, (2) allow effective TEMPEST protection to be implemented, (3) support reliable signal and data transmission without introducing noise coupling via safety grounds, and (4) maintain the integrity of electromagnetic interference (EMI) control and electromagnetic pulse (EMP) hardness measures. C4ISR facilities and the interconnections between the various system elements are very complex. Existing documentation of the as-installed grounding and bonding networks is typically not kept current. Therefore, this manual will provide a unified set of grounding and bonding practices specifically formulated for standard C4ISR facilities.

Document History

AR TM 5-690
February 15, 2002
GROUNDING AND BONDING IN COMMAND, CONTROL, COMMUNICATIONS, COMPUTER, INTELLIGENCE, SURVEILLANCE, AND RECONNAISSANCE (C4ISR) FACILITIES
The scope of this manual is to provide general guidance for design, construction, modification, inspection, and acceptance testing of the grounding and bonding subsystems for building protection,...