This document describes from an ergonomic point of view how GSM-R information will be arranged and displayed. More specifically it covers information that is out of the scope of ERA document ERA_ERTMS_015560. This document describes more ergonomic details than currently provided by the...
This document describes how ERTMS and non-ERTMS information will be arranged and displayed from an ergonomic point of view. More specifically, it covers information that is out of the scope of ERA_ERTMS_015560. This document describes more ergonomic details than currently provided by the...
This instruction applies to all staff engaged in the maintenance and testing of all GSM-R FTS Sub Systems (Dicora) in operational building. For the purposes of this instruction an operating centre includes: - • Operational Control Offices • Electrical Control Offices • Signalling/Operating
This procedure applies to lineside infrastructure failure, fixed terminal failure and cab mobile failure and has been developed to all those using authorised radio systems on Network Rail infrastructure. It excludes contingency plans for GSM-R cab mobile radio failures. Arrangements for...
This instruction applies to all staff engaged in the maintenance and testing of all lineside assets (such as Signal Post Telephones, Crossing Telephones etc) and operational building telephones. For the purposes of this instruction an operational building shall include: - • Operational Control...
In accordance with the ERTMS/ETCS specifications, Subset 121, UIC 612 leaflet, ERA_ERTMS_015560 document, EN 50126 and EN 61375 series requirements, this Technical Report describes the Train Display System (TDS) in the driver's cab, and the link between the TDS/TDC and some of its interfaces (Blue...
Scope & Purpose The purpose of this Standard is to facilitate a TSP's compliance with the assistance capability requirements defined in Section 103 of CALEA [Ref 1]. This Standard defines capabilities to support LAES and the interfaces to deliver intercepted communications and reasonably available...
This Recommendation aims to provide a better understanding of the energy efficiency of mobile networks in particular considering the networks' evolution in different periods of time. The focus of this Recommendation is on metrics for energy efficiency and methods of assessing (and measuring) energy...
This document specifies harness excitation test methods and procedures for determining the immunity of electronic components of passenger cars and commercial vehicles regardless of the propulsion system (e.g. spark-ignition engine, diesel engine, electric motor). The bulk current injection (BCI)...
This document specifies harness excitation test methods and procedures for determining the immunity of electronic components of passenger cars and commercial vehicles regardless of the propulsion system (e.g. spark-ignition engine, diesel engine, electric motor). The bulk current injection (BCI)...
This business process sets out: a) the procedure for coordinating, assigning and recording the unique National Identities and values to meet the responsibility requirements in RIS-8072-CCS; and b) the way in which the National Records Group (NRG) is to discharge its duty as National Identities...
This module applies to all NWR structures and associated components providing GSM-R, RETB, microwave and spot radio services to the UK rail network. Purpose The purpose of this document is to specify a set of maintenance requirements designed to provide assurance to the asset owners that the...
The present document applies to the following equipment types: 1) Multi-Standard Radio capable Base stations (E-UTRA, UTRA, GSM/EDGE, NB-IoT). These radio equipment types are capable of operating in all or any part of the frequency bands given in table 1-1. Table 1-1: Base station operating...
Narrow Your Results