1.1 Bungee jumping as it pertains to this standard is an activity where a participant (jumper) is connected to a bungee cord and harness system and, when directed jumps or falls from a height from a designated jump point. The jumper then descends via gravity until the elastic bungee cord...
4.1 Cable-tool rigs (also referred to as churn rigs, water-well drilling rigs, spudders, or percussion rigs) are used in the oil fields and in the water-well industry. The Chinese developed the percussion method some 4,000 years ago. 4.2 Cable-tool drilling and sampling methods may be...
1.1 This practice describes "System" as a robotic, automatic, or autonomous system (for example, robot arm; automatic machine; automatic, automated, or autonomous?-?uncrewe
5.1 PCRT Applications and Capabilities-PCRT has been applied successfully to a wide range of NDT applications in the manufacture and maintenance of metallic and non-metallic parts. Examples of anomalies detected are discussed in 1.1. PCRT has been shown to provide cost effective and accurate NDT...
5.1 The presence of partial discharges (corona) at operating voltage in an insulation system has the potential to result in a significant reduction in the life of the insulating material. Some materials are more susceptible to such discharge damage than others. This characteristic can...
5.1 This test method is part of an overall suite of related test methods that provide repeatable measures of robotic system mobility and remote operator proficiency. This gravel terrain specifically challenges robotic system locomotion, suspension systems to maintain traction,...
5.1 This test method is part of an overall suite of related test methods that provide repeatable measures of robotic system mobility and remote operator proficiency. This sand terrain specifically challenges robotic system locomotion, suspension systems to maintain traction,...
5.1 PCRT Applications and Capabilities-PCRT PTI examination has been applied successfully to a wide range of parts in manufacturing and maintenance environments. Examples of manufacturing processes, repair processes, and in-service damage mechanisms evaluated with PTI are discussed in 1.1. PCRT has...
1.1 These test methods cover three electrical tests on plastic guards and assembled guard systems. They are: 1.1.1 Method A-Withstand voltage proof test, 1.1.2 Method B-Flashover voltage, and 1.1.3 Method C-Leakage current. 1.1.4 This specification covers plastic guard equipment and guard...
1.1 This practice covers the installation of suspended systems for acoustical tile and lay-in panels and their additional requirements for two groups of buildings that are constructed to resist the effects of earthquake motions as defined by ASCE 7 and the International Building Code. These...
Narrow Your Results