loading
J2931/4_202305 - Broadband PLC Communication for Plug-in Electric Vehicles
May 24, 2023 - SAE International

This SAE Technical Information Report SAE J2931/4 establishes the specifications for physical and data-link layer communications using broadband Power Line Communications (PLC) between the plug-In electric vehicle (PEV) and the electric vehicle supply equipment (EVSE) DC...

UL 1977 - Component Connectors for Use in Data, Signal, Control and Power Applications
December 7, 2022 - ULSE

019770-000000-000000 1 Scope 1.1 These requirements cover single and multipole connectors, intended for factory assembly to copper or copper alloy conductors or printed wiring boards, for use in data, signal, control and power applications within and between electrical equipment. 1.2 These...

J2698_202206 - Primary Single Phase Nominal 120 VAC Wiring Distribution Assembly Design—Truck and Bus
June 22, 2022 - SAE International

This SAE Recommended Practice covers the design and application of primary on-board wiring distribution system harnessing for surface vehicles. This document is intended for single phase nominal 120 VAC circuits that provide power to truck sleeper cab hotel loads so that they may operate...

UL 60335-2-24 - Household and Similar Electrical Appliances - Safety - Part 2-24: Particular Requirements for Refrigerating Appliances, Ice-Cream Appliances and Ice-Makers
July 29, 2022 - ULSE

603350-000020-000240 1 Scope This clause of Part 1 is replaced by the following: This International Standard deals with the safety of the following appliances, their RATED VOLTAGE being not more than 250 V for single-phase appliances, 480 V for other appliances and 24 V DC for appliances...

NR/L2/ELP/CTM015/010 - Competence & Training in DC Conductor Rail Engineering: DCCR 10: Contribute to Minimising Risk When Working On or Near Live DC Conductor Rail or Electrical Power Supply Equipment
June 1, 2019 - NR

This competence standard applies in all circumstances where any person is required to contribute to minimisation risks when working on or near live DC Conductor Rail Equipment or Electrical Power Supply Equipment on Network Rail controlled infrastructure. The level and extent...

NR/L3/ELP/27240/NR/D/C26R - D.C. Frame Leakage Test Record Sheet
December 5, 2020 - NR
A description is not available for this item.
NR/L3/ELP/27240/NR/D/C26O - Routine Testing of D.C. Frame Leakage Protection - Siemens DSG & 8MF94 Second Generation
December 5, 2020 - NR

Includes: This instruction describes how to test D.C. frame leakage protection installed on Siemens DSG and 8MF94 (2nd Gen) switchboards. Excludes: All other types of frame leakage protection

NR/L3/ELP/27240/NR/D/C34B - Isolation of the AC/DC Interface Trackside Slave Contactor (TSC) Panels
December 5, 2020 - NR

Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of Certificate of Isolation to place the Trackside Slave Contactors (TSC) at Blackfriars station (see figure 1) to enable maintenance work / testing to be carried out. Excludes: These...

NR/L3/ELP/27240/NR/D/C34E - Routine Maintenance of the AC/DC Interface Trackside Slave Contactor (TSC) Panels
December 5, 2020 - NR

Includes: This document details the routine maintenance to be carried out on the Trackside Slave Contactors (TSC) at Blackfriars station (see figure 1). Excludes: These instructions do not include the routine maintenance of main D.C. contactor suites at Ludgate Cellars Substation, that operate the...

NR/L3/ELP/27240/NR/D/C26N - Routine Testing of D.C. Frame Leakage Protection - Balfour Beatty GE-Rapid
December 5, 2020 - NR

Includes: This instruction describes how to test D.C. frame leakage protection installed on Balfour Beatty GE-RAPID switchboards using the DCP116 protection relay. It follows the methodology that tests stage 1 and stage 2 separately however a single test may be undertaken if agreement is reached...

NR/L3/ELP/27240/NR/D/C34G - Isolation of DC Voltage Monitoring Panels Installed at Ludgate Cellars Substation
December 5, 2020 - NR

Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of Certificate of Isolation for the DC Voltage Monitoring (VM) panels installed at Ludgate Cellars substation (see figure 1) to enable maintenance work / testing to be carried...

NR/L3/ELP/27240/NR/D/C34D - Routine Maintenance of the AC/DC Interface Programmable Logic Controller (PLC) at Ludgate Cellars Substation
December 5, 2020 - NR

Includes: This document details the routine maintenance to be carried out on the Programmable Logic Controller (PLC) for the main D.C. Contactors at Ludgate Cellars Substation (see figure 1). Excludes: These instructions do not include the routine maintenance of either the main D.C. Contactors at...

NR/L3/ELP/27240/NR/D/C34F - Isolation of the AC/DC Interface Ludgate Cellars Rectifiers R3, R4, R5, R6
December 5, 2020 - NR

Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of Certificate of Isolation of Rectifiers R3, R4, R5 & R6 at Ludgate Cellars Substation to enable maintenance work / testing to be carried out. Excludes: These instructions do not...

NR/L3/ELP/27240/NR/D/C26Q - Routine Testing of D.C. Frame Leakage Protection - Hawker Sidderley Switchgear NDC4
December 5, 2020 - NR

Includes: This instruction describes how to test D.C. frame leakage protection installed on Hawker Sidderley Switchgear (HSS) NDC4 switchboards. These switchboards do not require and are not fitted with second stage frame leakage. Excludes: All other types of frame leakage protection

NR/L3/ELP/27240/NR/D/C26L - Routine Testing of D.C. Frame Leakage Protection - Whipp & Bourne MM74
December 5, 2020 - NR

Includes: There are three main generations of the MM74 switchboards. This instruction describes how to test D.C. frame leakage protection installed on Whipp & Bourne 2nd and 3rd generation. Stage 1 and stage 2 are tested separately however a single test may be undertaken if agreement is reached...

NR/L3/ELP/27240/NR/D/C03R - Routine Maintenance of Hawkgas 25 SMOS (Structure Mounted Outdoor Switchgear)
December 5, 2020 - NR

Includes: This instruction covers the routine maintenance of Hawker Sidderley Switchgear (HSS) Hawkgas 25 kV SMOS (structure mounted outdoor switchgear).

NR/L3/ELP/27240/NR/D/C34H - Routine Maintenance of DC Voltage Monitoring Panels Installed at Ludgate Cellars Subst
December 5, 2020 - NR

Includes: This instruction covers the procedure for the routine maintenance of D.C. Voltage Monitoring (VM) panels installed at Ludgate Cellars substation (see figure 1). Excludes: These instructions do not include the routine maintenance of main D.C. contactor suites at Ludgate Cellars Substation...

NR/L3/ELP/27240/NR/D/C26M - Routine Testing of D.C. Frame Leakage Protection - Secheron UR36/UR40
December 5, 2020 - NR

Includes: This instruction describes how to test D.C. frame leakage protection installed on Secheron UR36 and UR40 switchboards. It follows the existing work instruction methodology that tests stage 1 and stage 2 separately however a single test may be undertaken if agreement is reached with the...

NR/L3/ELP/27240/NR/D/C26P - Routine Testing of D.C. Frame Leakage Protection - Siemens 8MF94 First Generation
December 5, 2020 - NR

Includes: This instruction describes how to test D.C. frame leakage protection installed on Siemens 8MF94 1st generation switchboards. These switchboards are fitted with second stage frame leakage. It follows the existing work instruction methodology that tests stage 1 and stage 2 separately...

Advertisement