Introduction and Summary Gasoline marketing in this country has undergone significant changes in the last 15 years. In response to these changes, some dealers and other market participants have called for the enactment of divorcement and open supply legislation at both the state and federal levels....
5.1 If required by the authority having jurisdiction, pressurized gaseous testing media leak testing is conducted after installation to discover and correct or repair leaks or faults in a newly constructed or modified PA12 pressure piping system before placing the system in service. Leakage...
5.1 If required by the authority having jurisdiction, pressurized gaseous testing media leak testing is conducted after installation to discover and correct or repair leaks or faults in a newly constructed or modified polyethylene pressure piping system before placing the system in service....
5.1 All noise control features associated with the inlet or exhaust of large industrial fans and gas turbines are, or should be, based upon inlet or exhaust sound power levels in octave bands of frequency. Sound power levels are not directly measurable, however, so they must be calculated...
1.1 Purpose-This practice covers standardized techniques for actively collecting soil gas samples from the vadose zone beneath or near dwellings and other buildings. 1.2 Objectives-Objective
Inventories of Natural Gas Liquids and Liquefied Refinery Gases presents data on the inventory levels of ethane, propane, isobutane, normal butane and pentanes plus. These inventories, located at natural gas plants, refineries, bulk terminals and in underground storage, are...
1.1 These requirements cover: a) Meters for flammable and combustible liquids, of the type and size commonly used in the assembly of motor fuel dispensing devices; and b) Meters for liquefied petroleum gas (LP-Gas), of the type and size commonly used in the assembly of...
Applicability. This code is a safety code that shall apply to the installation of fuel gas piping systems, appliances, equipment, and related accessories as shown in 1.1.1.1(A) through 1.1.1.1(F). (A)* Coverage of piping systems shall extend from the point of delivery to the appliance...
1.1 These requirements cover: a) Meters for flammable and combustible liquids, of the type and size commonly used in the assembly of motor fuel dispensing devices; and b) Meters for liquefied petroleum gas (LP-Gas), of the type and size commonly used in the assembly of...
This Practice covers the minimum requirements for design, fabrication, inspection, testing, shipment, and documentation for gas insulated switchgear containing gas-insulated buses, power circuit breakers, control, instrumentation, and metering for installation in...
Narrow Your Results