004670-000000-000000
This Standard applies to grounding and bonding equipment for use in accordance with the Canadian Electrical Code, Part I, CSA C22.1, in Canada, the National Electrical Code, NFPA 70, in the United States, or the Standard for Electrical Installations, NOM-001-SEDE, in Mexico....
This standard is intended to define and describe the grounding and bonding topologies commonly used for the installation of network telecommunications equipment in central offices and similar type facilities. It addresses the requirements for grounding...
This standard is intended to define and describe the grounding and bonding topologies commonly used for the installation of network telecommunications equipment in central offices and similar type facilities. It addresses the requirements for grounding...
Learn the theory behind grounding systems and bonding equipotential connections from a worldwide expert. Through mathematical analysis, comprehensive explanations, and detailed figures, Analysis of Grounding and Bonding Systems explains the theory...
This standard describes installation procedures for building and service entrance grounding as well as building interior bonding and grounding. It is intended to define what is meant by installing equipment in a "neat and workmanlike manner" as required by...
INTRODUCTION General Modem telecommunications require an effective infrastructure within a building to support the wide variety of systems that rely on the electronic transport of information. This infrastructure encompasses telecommunications equipment spaces, cable pathways, telecommunications..
This ARP provides the rationale and theory of charges being present on aircraft while on the ground. The necessary implementation of safety practices are explained and defined.
This ARP provides the rationale and theory of charges being present on aircraft while on the ground. The necessary implementation of safety practices are explained and defined.
This recommended practice covers the grounding and bonding of equipment in industrial and commercial power systems. The interconnection and grounding of the non-electrical metallic elements of a system is covered first. This is followed by a discussion of...