loading
ASTM E2956-23 - Standard Guide for Monitoring the Neutron Exposure of LWR Reactor Pressure Vessels
September 1, 2023 - ASTM International

1.1 This guide establishes the means and frequency of monitoring the neutron exposure of the LWR reactor pressure vessel throughout its operating life. 1.2 The physics-dosimetry relationships determined from this guide may be used to estimate reactor pressure vessel damage through the application...

CEI EN IEC 60964 - Nuclear power plants - Control rooms - Design
March 1, 2020 - CEI

This document establishes requirements for the human-machine interface in the main control rooms of nuclear power plants. The document also establishes requirements for the selection of functions, design consideration and organization of the human-machine...

ASTM E2956-21 - Standard Guide for Monitoring the Neutron Exposure of LWR Reactor Pressure Vessels
February 1, 2021 - ASTM International

1.1 This guide establishes the means and frequency of monitoring the neutron exposure of the LWR reactor pressure vessel throughout its operating life. 1.2 The physics-dosimetry relationships determined from this guide may be used to estimate reactor pressure vessel damage through the application...

IEC 60964 - Nuclear power plants - Control rooms - Design
November 1, 2018 - IEC

This document establishes requirements for the human-machine interface in the main control rooms of nuclear power plants. The document also establishes requirements for the selection of functions, design consideration and organization of the human-machine...

IEC 60964 REDLINE - Nuclear power plants - Control rooms - Design
November 1, 2018 - IEC

This document establishes requirements for the human-machine interface in the main control rooms of nuclear power plants. The document also establishes requirements for the selection of functions, design consideration and organization of the human-machine...

CEI EN 60965 - Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room
July 1, 2017 - CEI

This International Standard establishes requirements for the Supplementary Control Room provided to enable the operating staff of nuclear power plants to shut down the reactor, where previously operating, and maintain the plant in a safe shut-down state in the event that control of the safety...

CEI EN 61227 - Nuclear power plants - Control rooms - Operator controls
February 1, 2017 - CEI

This International Standard supplements IEC 60964 which applies to the design for control rooms of nuclear power plants. It identifies the Human-Machine Interface (HMI) requirements for discrete controls, multiplexed conventional systems, and soft control systems. For the main...

DS/EN 60965 - Nuclear power plants – Control rooms – Supplementary control room for reactor shutdown without access to the main control room
September 19, 2016 - DS

This International Standard establishes requirements for the Supplementary Control Room provided to enable the operating staff of nuclear power plants to shut down the reactor, where previously operating, and maintain the plant in a safe shut-down state in the event that control of the safety...

DS/EN 61227 - Nuclear power plants - Control rooms - Operator controls
March 30, 2016 - DS

IEC 61227:2008 identifies the Human-Machine Interface (HMI) requirements for discrete controls, multiplexed conventional systems, and soft control systems. To be used with IEC 60964 and IEC 61772. Is intended for application to the design of new main control rooms in nuclear...

IEC 60965 - Nuclear power plants – Control rooms – Supplementary control room for reactor shutdown without access to the main control room
February 1, 2016 - IEC

This International Standard establishes requirements for the Supplementary Control Room provided to enable the operating staff of nuclear power plants to shut down the reactor, where previously operating, and maintain the plant in a safe shut-down state in the event that control of the safety...

DIN EN 12309-7 - Gas-fired sorption appliances for heating and/or cooling with a net heat input not exceeding 70 kW - Part 7: Specific provisions for hybrid appliances
March 1, 2015 - DIN

This part of EN 12309 deals particularly with the specific provisions of hybrid heating appliances based on gas-driven sorption heat pumps as defined in Part 1. The heating appliances covered by this European Standard are of a hybrid type, an encased assembly or assemblies combining a direct or...

CEI EN 62241 - Nuclear power plants - Main control room - Alarm functions and presentation
October 1, 2015 - CEI

Scope and object This International Standard provides the functional requirements for the alarm systems in the main control room of nuclear power plants. It gives definitions of the terms used for alarm functions. It also establishes the human factors requirements and the design guidelines...

ASTM E2956-14 - Standard Guide for Monitoring the Neutron Exposure of LWR Reactor Pressure Vessels
February 1, 2014 - ASTM International

4.1 Regulatory Requirements-The USA Code of Federal Regulations (10CFR Part 50, Appendix H) requires the implementation of a reactor vessel materials surveillance program for all operating LWRs. Other countries have similar regulations. The purpose of the program is to (1) monitor changes in the...

DS/EN 60964 - Nuclear power plants – Control rooms – Design
April 9, 2010 - DS

IEC 60964:2009 provides functional design requirements to be used in the design of the main control room of a nuclear power plant to meet operational and safety requirements. Also provides functional interface requirements which relate to control room staffing, operating procedures, and the...

IEC 61227 - Nuclear power plants – Control rooms – Operator controls
April 1, 2008 - IEC

This International Standard supplements IEC 60964 which applies to the design for control rooms of nuclear power plants. It identifies the Human-Machine Interface (HMI) requirements for discrete controls, multiplexed conventional systems, and soft control systems. For the main...

IEC 62241 - Nuclear power plants Main control room Alarm functions and presentation
November 1, 2004 - IEC

Scope and object This International Standard provides the functional requirements for the alarm systems in the main control room of nuclear power plants. It gives definitions of the terms used for alarm functions. It also establishes the human factors requirements and the design guidelines...

DSF/FPREN IEC 60964 - Nuclear power plants – Control rooms – Design
DS

IEC 60964:2018 is available as IEC 60964:2018 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.IEC 60964:2018...

IEC 61771 - Nuclear Power Plants - Main Control-Room - Verification and Validation of Design
December 1, 1995 - IEC

This International Standard specifies verification and validation (V&V) procedures for the design of the control-room system of nuclear power plants and gives verification and validation criteria for the assignment of functions and for the integrated control-room system. It describes how to review...

Advertisement