UFGS-33 08 55 - FUEL DISTRIBUTION SYSTEM START-UP (NON-HYDRANT)
August 1, 2019 - NAVY

NOTE: This guide specification covers the requirements for the start-up (flushing, cleaning, equipment tests), and performance testing of new and existing fuel systems that are dead head type. That is, systems where fuel is issued out of a tank, through a pump, and then into a dead-end...

AWWA C502 - Dry-Barrel Fire Hydrants
October 24, 2018 - AWWA

This standard describes post-type, dry-barrel fire hydrants with compression shutoff (opening against or with the pressure) or gate shutoff for use in fire protection service in all climates, including those where freezing occurs. Exceptions. This standard does not cover the wet-barrel or...

UFGS-33 08 53 - AVIATION FUEL DISTRIBUTION SYSTEM START-UP
August 1, 2018 - ARMY

NOTE: This guide specification covers the requirements for the flushing, cleaning and performance testing of new and existing aircraft refueling systems constructed to the requirements of the DoD Type III/IV/V, and Cut and Cover Hydrant Refueling System Standards.

AWWA M17 - Fire Hydrants: Installation, Field, Testing, and Maintenance
January 1, 2016 - AWWA

Foreword This manual was prepared by the AWWA Standards Committee on Fire Hydrants. It is intended for use by persons responsible for the installation, operation, and maintenance of dry-barrel and wet-barrel fire hydrants. It is the fifth revision of the original manual, which was...

AENOR UNE-EN 12312-5 ENG - Aircraft ground support equipment - Specific requirements - Part 5: Aircraft fuelling equipment
April 1, 2009 - AENOR

This document specifies the technical requirements to minimise the hazards listed in Clause 4 which can arise during the commissioning, operation and maintenance of AFE when carried out in accordance with the specifications given by the manufacturer or his authorised representative. It also takes...