loading
DIN EN 13450 - Aggregates for railway ballast
July 1, 2013 - DIN

This European Standard specifies the properties of aggregates obtained by processing natural, manufactured or recycled crushed unbound aggregates for use in construction of the upper layer of railway track. For the purposes of this standard, the aggregate is referred to as railway...

BS EN 13450 - Aggregates for railway ballast
January 10, 2003 - BSI
A description is not available for this item.
DS/EN 13450 - AGGREGATES FOR RAILWAY BALLAST
DS
A description is not available for this item.
NR/L2/TRK/8100 - Railway Ballast & Stoneblower Aggregate (aka NR/SP/TRK/006)
June 6, 2009 - NR

This specification applies to all Railway Ballast for use in Network Rail controlled infrastructure except for ballast directly returned to the track by a ballast cleaning machine. This specification also applies to aggregates used in conjunction with a stoneblowing...

PREN 13450 - Draft BS EN 13450 Aggregates for railway ballast
June 4, 2015 - BSI
A description is not available for this item.
AREMA RAILWAY MANUAL - MANUAL FOR RAILWAY ENGINEERING
AREMA
A description is not available for this item.
DIN EN 17282 - Railway applications - Infrastructure - Under ballast mats
December 1, 2020 - DIN
A description is not available for this item.
BS EN 17282 - Railway applications — Infrastructure — Under ballast mats
October 31, 2020 - BSI
A description is not available for this item.
PREN 17282 - RAILWAY APPLICATIONS - INFRASTRUCTURE - UNDER BALLAST MATS
BSI
A description is not available for this item.
AI RR-84-1 - Kentrack: A Computer Program for Hot-Mix Asphalt and Conventional Ballast Railway Trackbeds
September 1, 1984 - AI/ASPHALT
A description is not available for this item.
Ballast Railroad Design: SMART-UOW Approach
July 4, 2018 - CRC

The railway track network plays an essential role in the transportation infrastructure worldwide. A ballasted railroad is commonly used for several reasons, including economic, rapid drainage and ease of maintenance. Given the increasing demand for trains to carry heavier loads,...

GMW15445 - Vehicle Ballast
April 1, 2017 - GMW

Introduction Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. Purpose. To subject test vehicles to passenger and cargo loading representative of customer...

DS/EN 50311 - Railway applications - Rolling stock - D.C. supplied electronic ballasts for lighting fluorescent lamps
November 28, 2003 - DS

This standard specifies the performance and constructional requirements, and associated tests, for d.c. supplied electronic ballasts used to supply fluorescent lamps for lighting on railway rolling stock. Its requirements replace those of EN 60925 for all railway rolling stock...

CEI EN 62718 - Railway applications - Rolling stock - DC supplied electronic ballasts for lighting fluorescent lamps
November 1, 2016 - CEI

This International Standard specifies the performance and constructional requirements, and associated tests, for d.c. supplied electronic ballasts used to supply fluorescent lamps for lighting on railway rolling stock. Its requirements replace those of IEC 61347 for all railway...

DS/EN 62718 - Railway applications - Rolling stock - DC supplied electronic ballasts for lighting fluorescent lamps
April 27, 2016 - DS

IEC 62718:2013 specifies the performance and constructional requirements, and associated tests, for d.c. supplied electronic ballasts used to supply fluorescent lamps for lighting on railway rolling stock. Its requirements replace those of IEC 61347 for all railway rolling...

NEMA BL 3 - Dimming Ballast Energy Performance
January 1, 2013 - NEMA

This standard provides a methodology for applying existing test methods for program start ballasts to fluorescent dimming ballasts and provides a way to calculate BLE for fluorescent dimming ballasts. NEMA offers this standard to augment and harmonize with the 2014 Department...

DSF/FPRCEN/TR 14067-7 - Railway applications – Aerodynamics – Part 7: Fundamentals for test procedures for train-induced ballast projection
DS

This document discusses: - economic aspects of ballast projection; - comparison of methods in France and Spain for rolling stock; - infrastructure assessment methods; - review of available literature; - next steps and recommendations regarding standardization and research.

NR TWI 3B015 - How to Glue Ballast
March 1, 2005 - NR

Introduction This Track Work Instruction covers the gluing of ballast, sometimes referred to as 'ballast bonding'. Ballast gluing is a technique used to increase the stability of the track at locations where any lateral movement is particularly undesirable. The technique can...

Advertisement