1.1 These requirements cover refrigerant recovery and recycling equipment to be employed in accordance with the National Electrical Code, NFPA 70 and include battery operated equipment. 1.2 These requirements apply to equipment intended for indoor or outdoor use or both. 1.3 These...
This standard covers rope based deployment and recovery systems that are integrated by defining the adequate acceptance criteria for delivery and the adequate designated service limits: - The deployment and recovery system shall meet the acceptance criteria at hand-over....
Halon 1211 Recovery/Recharge Equipment UL 2006 1.1 These requirements cover Halon 1211 recovery/recharge equipment rated 600 volts or less, and intended to be used in ordinary locations in accordance with the National Electrical Code, NFPA 70. 1.2 Halon 1211 recovery/recharge...
1.1 These requirements cover nonducted, stationary or fixed heat recovery ventilators for household, commercial, or industrial use and intended to be employed in accordance with the National Electrical Code, ANSI/NFPA 70. 1.2 These requirements cover heat recovery ventilators rated...
This standard applies to equipment for recovering and/or recycling, as per ASHRAE Standard 34, single refrigerants, azeotropes, zeotropic blends, and their normal contaminants from refrigerant systems. This standard defines the test apparatus, test gas mixtures, sampling procedures and...
Stage II vapor recovery is a well-known air quality control measure that reduces ozone precursors from gasoline dispensing facilities (GDFs). As a result of its relative high-visual profile, Stage II vapor controls are sometimes proposed as a part of a regional air quality attainment...
This INTERIM Defence Standard specifies the characteristics of recovery eyes/lugs fitted to tracked and wheeled tactical land vehicles, armoured fighting vehicles, plant equipment, towed plant ant trailers to enable them to be recovered safely. It rationalizes on the sizes of recovery...
Application This procedure is used to determine the recovery of soft interior composite systems after application of static load using an indenter.
1.1 These requirements cover ducted heat recovery ventilators intended to remove air from buildings, replace it with outside air, and in the process transfer heat from the warmer to the colder air. These units are intended to be connected to duct systems that interconnect rooms or...
NOTE: This guide specification covers the requirements for both fire-tube and water-tube heat recovery, steam generating boilers with individual capacities from 907 to 136,000 kg 2,000 to 300,000 pounds of steam per hour.
This guideline applies to energy recovery ventilation component applications and combinations of energy recovery components with unitary heating, ventilating, and air-conditioning equipment incorporating mechanical ventilation with outside air. This guideline applies only to energy...
General This class guideline gives requirements for cargo vapour recovery systems required to be fitted for class notation VCS(3) and VCS(L, X%) according to DNV GL rules for classification: Ships DNVGL-RU-SHIP Pt.6 Ch.4 Sec.11 Cargo operations, on the following working principles: -...
The book is a combined planning/response-fo
This document describes protocol specific procedures for GMPLS (Generalized Multi-Protocol Label Switching) RSVP-TE (Resource ReserVation Protocol - Traffic Engineering) signaling extensions to support label switched path (LSP) segment protection and restoration. These extensions are intended to...
1.1 This test method defines a method and measurement criteria to quantify the performance of a stationary skimmer in ideal conditions in support of a device's nameplate recovery rate (capacity). If a determination of a skimmer's capabilities in realistic conditions (that is, advancing or...
Narrow Your Results